Request DetailsLVT Flooring Fitting
How large will be the flooring area in square meters?
50-99
How many rooms would you like fitted with LVT flooring?
4
Will old flooring or carpet need to be removed?
No need to remove flooring or carpet
Do you need the pro to provide the flooring?
Yes, include the new flooring in price
Job Details
SCOPE & PATTERN
Installation: Professional fitting of Herringbone Click LVT across Hall, Kitchen, Living, and 2 Bedrooms.
Layout: Pattern must be centered/aligned from the main hallway to ensure a seamless flow between rooms (Japandi aesthetic).
Prep: Client will remove existing carpets/grippers prior to arrival.
2. SUBFLOOR PREPARATION (Essential)
Moisture Control: Application of a Liquid DPM (e.g., Setcrete Rapid Set) to the ground floor slab.
Priming & Leveling: Concrete must be primed and leveled using a High-Performance Self-Levelling Compound.
Standard: Subfloor must meet SR1 standards (max 3mm deviation over 2m). Surfaces must be mechanically scraped and vacuumed.
3. MATERIALS & FINISH
Flooring: 5mm–6mm Rigid Core Click LVT.
Underlay: High-density 1mm–1.5mm LVT-specific underlay with vapor barrier.
Expansion: 7mm–10mm gap maintained at all perimeters.
Detailing: All door frames/architraves must be undercut (multi-tool) for the floor to sit flush underneath. No silicone/caulk gaps around frames.
Transitions: Seamless flow preferred. If bars are required, use low-profile matching MDF-wrapped sections (no metal).
Skirting: [Fit new skirting over floor / Fit matching scotia to existing].
4. CONTRACTOR REQUIREMENTS
Provide a 12-month workmanship guarantee.
Use a hygrometer to test slab moisture before installation.
Estimate wastage at 12–15% for the herringbone pattern.
Confirm acclimatization period (min 48 hours on-site).